loading

One-stop solution supplier for metal ceiling & metal facade products.

Projects

Tianjin Rail Transit Line 1
Tianjin Rail Transit Line 1, the city's first rail transit line, had a length of 42 kilometers and 32 stations (24 underground and 8 elevated) as of November 2022.
Wenzhou Grand Theater - Ballesta®

Wenzhou Grand Theatre (No. 466 Fudong Rd, Lucheng Dist, Wenzhou, near Fudong/Shifu Rds, city admin center) covers ~25,000㎡ (construction area ~36,000㎡), with key facilities: 1,425-seat opera hall, 664-seat concert hall, 165-seat multi-function hall and 150-seat small theater.
Guiyang Longdongbao International Airport - Ballesta®

As of Dec 2021, Guiyang Longdongbao International Airport has 3 terminals (T1: 81,000 ㎡; T2: 134,000 ㎡; T3: 167,000 ㎡), 122 civil aviation slots, 2 45m-wide runways (Middle: 4,000m; West: 3,500m), and meets 30 million annual passenger throughput.
Zhengzhou Xinzheng International Airport - Ballesta®
Zhengzhou Xinzheng International Airport’s large-scale ceiling projects: T2 Phase II (97,500㎡, 11,222㎡ aluminum panels), ~2,150㎡ corridor maintenance areas, 141,800㎡ deep cleaning (facades + corridors), and 228,000㎡ terminal/GTC facade/inner ceiling cleaning.
Zhengzhou University of Aeronautics Library - Ballesta®
Zhengzhou University of Aeronautics Library (formerly Zhengzhou Institute of Aeronautical Industry Management) sits at the campus entrance central axis end. With a doorframe structure and "seal-like" facade (evoking an unopened book), it follows an "inside-out" philosophy, embodying frugality, sustainability and eco-friendly design.
Nanjing South Railway Station - Ballesta®
Spanning an area of approximately 700,000 square meters, Nanjing South Railway Station boasts a total construction area of 458,000 square meters, with the main station building accounting for 387,000 square meters.
Harbin Institute of Technology - Ballesta®

As of Dec 2022, Harbin Institute of Technology (HIT) has 3 campuses (Harbin, Weihai, Shenzhen), covering a total area of 5.6542 million ㎡ and a combined building area of 3.5508 million ㎡.
Chongqing Rail Transit Line 1 - Ballesta®

Chongqing Rail Transit Line 1, the city’s 2nd operational urban rail line, had 45.34km in operation (25 stations: 16 underground, 9 elevated) as of Dec 2020.
Jinan West Railway Station - Ballesta®

The station has a total construction area of 100,000 ㎡ (main building: 62,534 ㎡). Its design reflects Shandong’s culture—drawing on traditional wooden architecture and ancient Chinese window elements, with a wavy curved roof; interior decoration has functional-area-specific styles for both aesthetics and practicality.
Guangzhou South Railway Station - Ballesta®

Guangzhou South Railway Station broke ground in Dec 2004 and opened on Jan 30, 2010. As of 2019, it has a total construction area of 615,000 ㎡ (main building: 486,000 ㎡), total investment of 130 million yuan, 15 platforms, 28 railway lines, and a 4-floor structure from the ground up.
Chengdu East Railway Station - Ballesta®
Chengdu East Railway Station boasts a total floor area of 220,000 square meters, with 107,000 square meters dedicated to passenger facilities. The station covers an expansive site area of 867,000 square meters.
Beijing South Railway Station - Ballesta®

Beijing South Railway Station (Fengtai Dist, Beijing), a large railway passenger hub under China State Railway Group, is a key departure station for major high-speed rails like Beijing-Tianjin Intercity, Beijing-Shanghai, Beijing-Guangzhou, and Beijing-Hong Kong-Macao lines.
no data
ARCHITECTURE SERVICE
CONTACT US ANYTIME
Copyright © 2026 Guangdong Disen Building Technology Co., Ltd. | Sitemap
Customer service
detect