Installation and Outcome
Our team worked closely with the plant’s operation management to create a phased construction plan. We focused on off-peak hours (night shifts or scheduled maintenance windows) to avoid disrupting daytime power generation.
On-site, we used specialized lifting equipment for safe, efficient installation, and fixed plates with anti-loosening bolts to prevent vibration-induced shifts. We also addressed site challenges: customizing plate cutouts and edge seals around existing pipelines or electrical boxes, ensuring a seamless, dust-proof fit.
Upon completion, the new ceiling met all safety and durability needs, brightened spaces (thanks to aluminum’s light reflection), and improved tidiness. The plant’s management specifically praised the project for minimal operational disruption and long-term practical value.